Overview

Glade Road has been an integral part of Colleyville’s road system for many decades, and is an important east-west transportation route for residents, businesses and visitors. The road shares many features, which contribute to Colleyville’s hometown feel, including trees, scenic pastures, and rural stretches.

City Council is reviewing and approving the designing for a majority of the project. Designs for phases 3-4 are not final.

Four Phases

The project and its timeline are divided into four phases.

Glade Road 4 Phases

Phase 1 - Bransford Road to Manning Drive
Scheduled to Begin 2017

Phase 1 features several intersection changes to improve traffic flow along the corridor including a new through lane at Bransford Road, a roundabout at Riverwalk Drive, the realignment of Bedford Road, and lowering Glade Road at Bluebonnet Drive to improve sight distance and remove the need for stop signs. The project will also add a 10' trail on the north side and a 5' sidewalk on the south.

City Council has approved this work and plans are in place to begin work from Bransford Road to Manning Drive in summer 2017.

Glade Road Phase 1 Screen
(Click the image to access Phase 1 design)

Phase 2 - Manning Drive to Pool Road
Construction slated for 2018

This phase of construction will include new pavement with left-turn lanes where warranted and standard curb and gutters. A 10' trail on the north side and a 5' sidewalk on the south.

City Council approved the design of this phase in May 2017.

Glade Road Phase 2 Screen
(Click the image above to access the Phase 2 design plans)

Phase 3 - Pool Road to Heritage Avenue
Construction slated for 2019

This portion of the roadway would receive new pavement with left-turn lanes where warranted and standard curb and gutters. A right-turn lane on Roberts Road and an additional westbound lane from Heritage Avenue to Roberts Road. A 10' trail on the north side and a 5' sidewalk on the south are also planned.

Phase 4 - Western City Limits to Bransford Road
Work slated for 2023

This phase of construction will include new pavement with left-turn lanes where warranted and standard curb and gutters. A 10' trail on the north side and a 5' sidewalk on the south.

Interim Maintenance
Portions of Glade Road are in need of improvement before planned project work. To maintain a quality driving surface, the City will conduct interim asphalt maintenance throughout the corridor.

This work is scheduled for Saturdays to minimize the impact to motorists.

Project History

July 2, 2012 – Preliminary engineering study authorized for Glade Road from Heritage
Avenue to SH26 (Colleyville Boulevard)
November 20, 2012 – Results of preliminary engineering study presented to City Council
February 19, 2013 – Engineering services agreement approved for concept design from
Heritage Avenue to west city limits
May 23, 2013 – Initial public input meeting
November 18, 2013 – Second Public Input Meeting (Concept Designs Presented)
March 3, 2014 – Recommended design presented to City Council
June 30, 2014 – Council worksession to discuss the project. Council provided direction to proceed with the final design of the section between Bransford Road and Manning Drive
July 15, 2014 – Approval of a final design contract for the section between Bransford Road and Manning Drive
October 3, 2014 –Acquisition of 1209 Glade Road (right-of-way necessary for the roundabout at the Riverwalk Intersection)
October 6, 2014 – Petition to limit scope of the Glade Road Project submitted to the City of
Colleyville
October 21, 2014 – Pre Council discussion and project design placed on hold
June 2, 2015 – Pre Council discussion and project was released to proceed with the design
May 3, 2016 - Approval of the right-of-way acquisition services contract
August 24, 2016 - City Council agrees to design from Bransford Road to Manning Drive
March 2017 - City plans to begin work from Bransford Road to Colleyville Boulevard in summer 2017.
May 2017 – City Council adopts designs for Phase 2